Water monitoring
Define what should be measured and where the readings are needed.
Planned plumbing systems
Discuss metering, monitoring and control requirements as part of a planned plumbing package. Share your specifications before any solution is proposed.
The more specific the brief, the more useful the first conversation.
Define what should be measured and where the readings are needed.
Identify the equipment, controls and building systems involved.
Document the site constraints and project handover requirements.
Start with a short project brief and attach the documents in your email app.
Use the BOQ enquiry page to prepare an email and attach your files in your email app.
The project scope and documents need to be reviewed before pricing can be discussed.
State whether you need usage readings, pressure information, leak alerts or a planned control requirement. Include the current equipment and the information the building team needs to see.
Share the manufacturer/model, plumbing layout, power or communications requirements and any existing building controls. Product compatibility and supported installation scope need review.
Identify the plumbing, electrical, controls and software responsibilities separately. This page starts a scope discussion; it does not promise a particular product, integration or monitoring service.
Explain whether the site is occupied or under construction, the number of connection points and access constraints.
Use the BOQ/project brief with relevant drawings and specifications attached in your email app.
For pipework, valves, pumps and distribution work, review the commercial or industrial piping route alongside the control requirement.